Lab Reconstruction Day 14

And on the two week mark (today) we were able to bring down system B. The picture here was taken from about the same place as the one in the day 9 post, and system B sits prominently in the foreground.

Now things are getting crowded, and there's still quite a bit left.

This is probably only a partial list, but here's everything that's coming down that I'm aware of:

MBE System D & System D's electronics console
The XPS System & electonics console/computer
The STM & console/computer?
Two 15' lengths of connection tubing
One short length of tube
Ion and cryo pumps for the tubes, along with electronics and controls
Clean work table/air filtration hood (it's HUGE, we have no idea how we're getting it down)
Ultra-pure de-ionized water filtration system
MBE System A's electronics console (going into storage as spare parts)
All of the various tools/spare parts we can grab

Somehow I don't think we'll be done by Thanksgiving like Jim was hoping.